FSA

Renovation of emergency department

Services Provided
Study / concept / preliminary design / final plans / services during construction
Sector
Maintien d'actifs
Budget
600 000 $

Complete renovation of major hallways, plaster room, 13 examining rooms, observation room with 6 stretchers as well as central desk for doctors, receptionists and coordinators. The main goals are renovating and refreshing the spaces made obsolete and functionally improving the existing spaces (built-in furniture, flexible floor covering with welded joints, paint, washable acoustic tile ceiling, wall protection, ect.)

The finishes and colours have been wisely chosen to create a warm environment, cosy and accessible for the users as well as for the children receiving treatment.