Services Provided
Study / Design / Preliminary concept / Final plans / Services during construction
Sector
Maintien d'actifs
Budget
7 900 000 $

The project consists of replacing the outer envelope and the complete inner refitting including replacement of the main mechanical and electrical systems of a 2 storey building with an area of 5 000 m².

The mandate was to validate client's needs, conduct preliminary studies such as study of obsolescence of mechanical systems, analysis of envelope's water infiltration and proposal of solutions, cost validation and schedule by phases to maintain building's operations during work, prepare tender and construction documents and site supervision.